S Korea’s Taekwang shuts PTA due to technical glitch

陈燕

  • 1

    留言
  • 472

    浏览
South Korean petrochemical producer Taekwang Industrial shut its 1m tonne/year PTA line at Ulsan on 4 December due to technical problems.When it will restart is still unknown. Market rumours, which said the plant was operating at low rates, were dismissed by the official. The firm’s contract volumes for December were likely to be reduced.
2009-12-08 收起回复

陈燕: 由于技术问题,韩国Taekwang于12月4日停车了其蔚山年产100万的PTA装置,具体重启时间尚不明确。

2009-12-08

总条数:1条