Japan Energy on track for Sep turnaround in Kashima

陈燕

  • 0

    留言
  • 529

    浏览
Refinery operator Japan Energy was on track to shut down its benzene and paraxylene (PX) production in Kashima starting from September for scheduled maintenance lasting for a period of 45 days. The 190,000-tonne/year benzene and 420,000-tonne/year PX plants were running at almost 100%.
2009-06-10 收起回复

总条数:0条